英语 英语 日语 日语 韩语 韩语 法语 法语 德语 德语 西班牙语 西班牙语 意大利语 意大利语 阿拉伯语 阿拉伯语 葡萄牙语 葡萄牙语 越南语 越南语 俄语 俄语 芬兰语 芬兰语 泰语 泰语 泰语 丹麦语 泰语 对外汉语

新西兰英语 179 Seven New Cycle Tracks

时间:2011-03-30 06:50来源:互联网 提供网友:oz5221   字体: [ ]
特别声明:本栏目内容均从网络收集或者网友提供,供仅参考试用,我们无法保证内容完整和正确。如果资料损害了您的权益,请与站长联系,我们将及时删除并致以歉意。
    (单词翻译:双击或拖选)

  The government said that work on the first seven cycle tracks which were promised earlier this year will start in the summer. This will cost $9 million. Another $41 million will be spent later. Together these cycle tracks will be called “The Great Rides”. (Listen to May 24th 2009)
  These cycle tracks will probably be used by Australian tourists and Kiwis who enjoy mountain biking. Already we have a very popular cycle track in Central Otago which brings in around $7 million to the local economy. Hotels and restaurants along the way provide jobs to local people.
  Five of these new cycleways will be in the North Island and two in the South Island. These are the North Island ones: in the Far North, a 90km track from the west coast to the east coast; Coromandel from Paeroa to the sea: along the Waikato River; the Central North Island Rail Trail; Mt Ruapehu along the Whanganui River to the sea. In the South Island, St James near Hanmer Springs; Southland around the mountains. Some of these are flat tracks but others will be hilly. Tracks using old rail trails or along rivers are flat but all the others are hilly.
  Building these cycleways will provide jobs for about 300 people.

本文本内容来源于互联网抓取和网友提交,仅供参考,部分栏目没有内容,如果您有更合适的内容,欢迎点击提交分享给大家。
------分隔线----------------------------
顶一下
(0)
0%
踩一下
(0)
0%
最新评论 查看所有评论
发表评论 查看所有评论
请自觉遵守互联网相关的政策法规,严禁发布色情、暴力、反动的言论。
评价:
表情:
验证码:
听力搜索
推荐频道
论坛新贴