Part 15 Preparing for sea
1. Close and secure hatch covers for sea.
2. Lash and secure goods for sea.
3. Close and secure bow doors.
4. Fold and secure bow ramp.
5. Side ramp folded and secured.
6. Lower and secure derricks for sea.
7. Check lashings and securing and report. |